SO the city is going to knock down the strip. Could be a balance of cleaning up some element issues along with a way to spend more tax dollars! What do you think?
Demolition and cleanup of an approximately 27,620 square foot, two-story, mixed use commercial and residential building. General construction characteristics of the building include wood frame concrete block construction with brick and concrete block exterior and a tarred wooden roof with rubber overlay over a concrete slab below grade foundation. The project also requires the removal of the basement/slab/foundation, backfilling with a compacted material, and grass seeding upon completion. Basement structures are limited to the far west commercial unit of the building located at 1027 W. Hillcrest; remaining units are concrete slab in construction. Parking lot pavement remains on the lot along with concrete sidewalk areas. Parking lot and sidewalks out of the public right of way are to be removed, leveled, and restored to grass. |
Publication Date/Time: |
3/22/2022 8:00 AM |
Publication Information: |
DeKalb Chronicle |
Closing Date/Time: |
4/11/2022 11:00 AM |
Submittal Information: |
City of DeKalb-Public Works., Attn: April Beeman, 1216 Market St., DeKalb, IL 60115 |
Bid Opening Information: |
04/11/2022 11:00am |
Pre-bid Meeting: |
March 30, 2022 10:00am |
Contact Person: |
Andy Raih 815-748-8111 andy.raih@cityofdekalb.com |
Miscellaneous: |
Question Response Date: 04/04/22 |
Related Documents: |
1011-1027 W Hillcrest Demolition |